Excel Sheets

Wall Pier Design Based on CBC 2001 / UBC 1997

Wall pier design is performed at the top and bottom of each pier. Thus, for. wall pier P2 at the Roof level, design is performed at the top and bottom of. the door opening. No design is performed near the mid height of the door.

admin
We will be happy to hear your thoughts

Leave a reply

Excel Sheets
Logo
Enable registration in settings - general
Compare items
  • Total (0)
Compare
0