“PRYING9” Program
“PRYING9” — AISC 9th ED. PRYING ACTION ANALYSIS PROGRAM |
Program Description: |
“PRYING9” is a spreadsheet program written in MS-Excel for the purpose of analysis for prying action in |
structural steel connections per the AISC 9th Edition (ASD) Code, pages 4-89 to 4-95. Specifically, bolt tension and |
bolt shear are checked, and the prying force and required thickness are determined. |
This program is a workbook consisting of three (3) worksheets, described as follows: |
Worksheet Name |
Doc |
Prying Action |
Allowable Tension Force |
Program Assumptions and Limitations: |
1. The Prying Action worksheet is valid for connections subjected to tension only, or to a combination of tension |
and shear. |
2. The Prying Action worksheet is only applicable for connection bolt diameters from 1/2” to 1-1/2 “ |
3. The Prying Action worksheet is only applicable for ASTM A325 or A490 high-strength connection bolts. |
4. The Prying Action worksheet is applicable to connection bolts in bearing with threads included in shear plane |
(N) or threads excluded from shear plane (X), as well as bolts in a slip critical connection (SC). |
5. The Prying Action worksheet is applicable to connections with either standard or oversized bolt holes. |
6. The Prying Action worksheet also takes fatigue effects into account when required to reduce the allowable bolt |
tension stress. |
7. The Allowable Tension Force worksheet has any applicable assumptions and limitations listed directly below |
the tables of values. |
8. This program contains numerous “comment boxes” which contain a wide variety of information including |
explanations of input or output items, equations used, data tables, etc. (Note: presence of a “comment box” |
is denoted by a “red triangle” in the upper right-hand corner of a cell. Merely move the mouse pointer to the |
desired cell to view the contents of that particular “comment box”.) |